The?Volta River?Authority (VRA) says the emergency load management programme implemented across the country as a result of energy shortfalls will be in force a little longer.
It says Ghanaians should brace up for ?some?kind of?emergency?outages?.
These were made known by Samuel Kwesi Fletcher, the Head of?Corporate Communicationsat VRA, in an interview with TV3?s Sandra Amarquaye on Friday, March 7.
Gas pressures are low, and the?volumes?are also extremely low, Mr Fletcher adduced.
He said?measures?have been put in place ?to make sure that the volumes are increased to levels that will help run the?machines?.
Last month, the Ghana Grid?Company?(GRIDCo) warned of more interruptions as a result of an emergency shutdown at the Aboadze Thermal Plant in the?Western Region.
The load?management company, therefore, asked Ghanaians to conserve electricity ?by switching off appliances and equipment which are not in use.?
Mr Fletcher noted that the situation has not changed and so Ghanaians should continue to?conserve electricity.
Source:?tv3network.com

